Factory Registration Requirements in Korea — Zoning, Building Use and Factory Area Ratio

November 20, 2026 · YouSun Administrative Agency

Factory Registration Requirements in Korea — Zoning, Building Use and Factory Area Ratio

Contents

  1. Four conditions
  2. Factories by zoning district
  3. Standard factory area ratio
  4. FAQ

A factory can be registered only if the business is manufacturing under the Korean Standard Industrial Classification, and the city, county or district office confirms that it meets the Building Act, the National Land Planning and Utilization Act, environmental rules and the standard factory area ratio. In practice the conditions are whether the zoning allows that factory, whether the building is in factory or manufacturing workshop use, and whether the factory area is large enough for the site.

For filing steps see our factory registration guide, and for leased buildings see registering a factory in a leased building.

Four conditions

ConditionRecord checkedTypical problem
Manufacturing businessIndustry in the business planOnly sales or storage, no processing, assembly or repair
ZoningLand use plan certificateExclusive residential zone, or a zone not allowing that factory
Building useBuilding registerNot factory or manufacturing workshop use
Area ratioLayout and area calculationFactory floor area below the industry standard

A manufacturing workshop must use under 500 square metres of floor area in the building and must not need an air, water or noise emission permit or report, unless all wastewater is sent out for treatment. A factory includes not only production lines but also trial production facilities, on-site support and welfare facilities and facilities required by law, and factories inside industrial complexes are registered by the complex management body instead of the local office. Beyond the workshop limits, the building needs factory use; see building use change.

Factories by zoning district

ZoneFactories
Exclusive residentialNot allowed
Type 1 general residentialOnly certain factories such as printing, sewing, computer assembly, tofu and laundry, under local ordinance and without listed pollutants
Exclusive and general industrialAllowed
Semi-industrialAllowed; factories of 5,000 square metres or more may be barred by ordinance
Production and natural greenOnly some, such as rice milling, food and high-tech factories, under ordinance
Planned managementNot allowed without a growth management or district unit plan; industry limits even with a plan

In the Seoul metropolitan overcrowding, growth management and nature conservation regions, new building, expansion, relocation or change of industry for factories of 500 square metres or more is restricted, and exceptions need approval. Ordinances vary by area.

Standard factory area ratio

  1. Site area is the horizontal projection of the site.
  2. Factory area is the floor area of every storey plus the projection of outdoor machinery and structures.
  3. Factory area must reach site area times the industry ratio, which ranges from 3% to 20%; knowledge industry centres use 40%.
  4. Multiple industries are weighted by their share of floor area.
  5. For approved factories, construction planned within 4 years of approval counts.

For example, a 1,000 square metre site in a 15% industry needs at least 150 square metres of factory area. Green zone sites, sites with a road of 6 metres or more and sites leased by the builder are exempt. When only part of a building is leased, the leased floor area is treated as the site.

YouSun Administrative Agency checks the land use plan and building register first, then calculates areas, drafts the business plan and files the registration. See our factory service page.

FAQ

Q. Can I check the land before signing?

A. Yes. On application by the owner or an interested party, the local office confirms within 10 days whether a factory can be built on that lot.

Q. What if the area ratio is not met?

A. For an approved factory, the completion report is returned until the requirement is met, so fix the area at the design stage.

Q. The zoning is fine but the building is office use.

A. Change it to factory or workshop use first; whether that is possible depends on zoning limits and the structure.

Send us the address and industry

Share the lot, building, industry and planned area, and YouSun Administrative Agency will check the conditions and what to solve first. Call 02-325-8222, weekdays 09:30~17:30 KST.